Really Useful Blog

Our Philosophy

At garment production, the "Bottleneck" is the sewing shop. All departments and other shops adapt to the output of the sewing shop specifically.

Only quality parts must enter the bottleneck so as not to waste time processing defective workpieces.

01
+
We sort/inspect
fabric
Only after these stages do we proceed
to the sewing process
02
+
Constructor checks patterns
03
+
Experimental shop sews a sample
04
+
Cut passes QC
05
+
1C checks accessories
Equipment

Equipment not only makes the product high quality but also incredibly speeds up the sewing production process.

Cutting shop —
the heart of our factory

Of course, we have standard equipment that you can find at almost every factory.

  • Automatic end cutter
  • Disc cutting knife
  • Fusing press

But here is the equipment that definitely distinguishes us from others.

  • Automated cutting complexes Gerber — 2 pcs
  • Spreading complexes Gerber — 2 pcs
  • Pass-through press 90cm Oshima
ALL THIS IS ACCOMPANIED BY CAD ACCUMARK AND 1C SOFTWARE / ALL THIS IS ACCOMPANIED BY CAD ACCUMARK AND 1C SOFTWARE /

SEWING SHOP

Of course, we have standard equipment at our disposal. All machines with maximum available automation.

  • Lockstitch — 114 pcs
  • Overlocks 3, 4 and 5 thread — 56 pcs
  • Buttonhole — 8 pcs
  • Blind stitch — 11 pcs

NOW ABOUT VTO

We haven't had a Client yet who wouldn't praise us for the quality of VTO.

MOISTURE HEAT TREATMENT ~ VTO ~
  • ICI Caldaie
    European leader in boiler equipment production
  • 100 kg
    This much steam this boiler produces per hour
  • 24 irons
    Saturated steam is supplied to this number of irons

THE ENTIRE PROCESS UNDER 1C CONTROL

Each stage of the process takes its specific place. Without such control at the factory, it would not be possible to maintain a high level of quality.

DIGITALIZATION AND AUTOMATION ~
01
Receipt of each roll and accessories in 1C to the material warehouse
02
Movement of material to the cutting shop area
03
Created semi-finished product in the 1C system
04
Movement of semi-finished product to the sewing shop
05
Movement from the brigade area to the final VTO area
06
Movement from VTO to QC area
07
Movement from QC to packaging area
08
Movement from packaging area to finished goods warehouse
APART FROM THE PRODUCTION PROCESS, WE HAVE DEVELOPED OUR OWN PLANNING SYSTEM, WHICH GIVES A CLEAR UNDERSTANDING OF THE ORDER COMPLETION DEADLINES
Full screen view